Floor Trusses

A digital device displaying a brochure about custom floor truss designs, stress-free building, and construction benefits, with icons of a construction hat and clock with dollar sign.
Comparison chart of field vs component framed construction, showing total onsite hours, load capacity, span length, and savings. Field framed has 31.5 hours, lower load, 20 ft span, saves 15 hours; component framed has 16.5 hours, higher load, 36+ ft span, with details provided.